The Project

MOTION ASIA PACIFIC COMMERCIAL SOLAR SOLUTION

The 99.99kW system was installed on screw down trim deck roof with a shallow pitch approx. 10 degree. Two inverters were installed at the external southern wall of building. A cage was installed around inverters to provide mechanical protection.

99.99 kWp Solar System

Location

Chullora, NSW

System Capacity

99.99kWp

Solar Panel

Suntech

Inverter

Huawei